A general purpose epoxy resin
based anti-corrosion primer designed for application direct to blast
cleaned steel. This product is formulated on the latest anti-corrosive
pigments and forms an excellent epoxy protective system for external
use. It is not intended for continuous water immersion, or prolonged
exposure to highly acidic atmosphere or spillage. Although the primer
has good intrinsic chemical resistance, attention should be paid to
the specified recoating schedule especially where strongly aggressive
chemical atmosphere are to be encountered.
PHYSICAL CHARACTERISTICS
OF WET PAINT
Pigment
composition
Zinc phosphate, titanium
dioxide, mineral extenders
Pigment
%
56.8%
Binder
type
Epoxy resin/polyamide
Binder %
18.2%
Thinner
composition
Ethylene glycol ethers/aromatic
hydrocarbons
Thinner%
25%
Volume
solids%
53%
Specific
gravity of paint
1.35 ± 0.03
Base: Activator
ratio by volume
4 : 1
Pot life
at 20º C
1 day
at 10º C
2 days
PHYSICAL CHARACTERISTICS
OF DRY FILM
Drying
time of standard
at 30º C
10 hours
at 20º C
16 hours
at 10º C
24 hours
Curing time before use
at 30º C
3 days
at 20º C
5 days
at 10º C
7 days
N.B. - Epoxy
curing
The curing of Epoxy resin-based
coatings is temperature dependant. It is seriously retarded
before 5º C (41º F).
Recoating
time
Minimum
Maximum
at 30º C
10 hours
3 days
at 20º C
16 hours
7 days
Standard
thickness
Wet paint:
94-118 microns (3.75-1.70 Mils)
Dry film:
50-62 microns (2-2 ½ Mils)
Theoretical
coverage on smooth surfaces
8.5-10.6 M² /litre (5.09-6.35
M² /kg)
APPLICATION
Brush/roller
Ready
for use for brush application. Roller application not recommended-inadequate
film thickness results.
Conventional
spray
Thinner addition
20º C
10-15%
By volume
10º C
15-20%
Thinner addition
by volume
Ready for use but
upto 10% dependent on temperature
Recommended
thinner
Epoxy thinner
SURFACE
PREPARATION
Structural
steelwork
Blast clean to BS4232:1967 'Second
Quality' (Swedish Standard SA 2 ½) or SSPC SP6 minimum
and apply Epoxy Zinc Phosphate Primer Two-Pack direct. Prime
immediately after blasting. If this is impractical both blasting
and priming must be completed within the same working day and
before the standard of blasting has deteriorated. Alternatively
Epoxy Zinc phosphate Primer Two-pack may be applied over an
appropriate protective primer. This should be clean, dry and
firmly adhering. (Polyvinyl butyral shop primers should not
be used under conditions of continuous immersion or, in conjunction
with cathodic protection).Must be clean, dry and grease free.
PAINT SYSTEM
One coat Epoxy Zinc Phosphate Primer, 50 microns
(2 Mils followed by one or two coats Epoxy Bildcote to a minimum
thickness of 200 microns (8 Mils) followed by Epoxy Finish)